Bottlenecks: how to find what limits your team's delivery

Follow the work to discover what limits delivery.

Pieces wait in a row on a stone surface, before a narrow passage.

A team spends its day completing tasks, yet the final deadline keeps slipping. The first response may be to demand more speed or hire more people. Before doing that, follow a deliverable through the process.

A bottleneck is a stage or resource whose capacity limits delivery flow under the conditions examined. To identify it, record the complete path, compare waiting points and investigate what prevents work from leaving the process.

Total time includes execution and waiting. A task can finish at one stage and spend days awaiting information for the next. Another may be returned repeatedly because completion criteria change during the work.

How busy each person is does not, on its own, explain what limits the result. Observe how tasks move through the process and where they stop advancing.

Choose a deliverable and follow its path

Imagine a fictional agency where communication materials take too long to be published. The creative team finishes drafts quickly. They then wait for review by someone who also works in sales and customer support.

To understand the delay, record when the task arrived, when it was worked on and when it could move forward. Separate working time from idle time. Note the reason for waiting instead of recording only that a delay occurred.

Track several different cases. Urgent work may follow an exceptional route; simple work may hide problems that appear only on larger tasks. Compare where waits recur and which conditions differ between cases.

Record returns too. A task sent back for revision consumes capacity at a stage it has already passed. Without that record, the process may look faster than it is.

A completed record of one item's path

This hypothetical record follows a single piece of agency content. The times reconstruct the sequence; one case cannot establish the team's capacity.

RecordItem statusExecution, waiting or rework
Monday, 9 a.m.Request received.Arrival; waiting to start.
Monday, 10 a.m. to noonCreative team prepares the draft.Execution.
Monday, noon to Tuesday, 2 p.m.Draft awaits review; the reviewer is handling sales.Waiting for review.
Tuesday, 2 to 2:30 p.m.Review identifies an offer condition that needs confirmation.Execution; item returned.
Tuesday, 2:30 p.m. to Wednesday, 9 a.m.Creative team awaits sales confirmation.Waiting for information.
Wednesday, 9 to 10 a.m.Condition confirmed; creative team revises the draft.Rework.
Wednesday, 10 to 11 a.m.Corrected draft awaits publication.Waiting to leave the process.
Wednesday, 11 a.m.Content published.End of the path being tracked.

The wait for review stands out, but the return caused by incomplete information also needs investigating. Compare other items: does the offer condition tend to arrive late? Is review available when materials are ready? A spreadsheet can hold the record; the question is what each interval reveals about the work.

Look for the constraint under current conditions

In the example, increasing creative output could make the review queue grow. More work would be finished locally, with little change in the amount published.

The reviewer may be an important constraint, but the team still needs to understand why. Does only that person have the necessary information? Are the criteria unclear? Could approval be distributed or removed? A queue reveals a difficult passage without automatically explaining its cause.

Several constraints may exist, and they can vary by task. Naming a single bottleneck too early narrows the investigation. Look for an intervention that improves the observed flow within a defined context.

Examine work that comes back

If review returns many drafts, reducing the approval queue may be insufficient. The team needs to know what is missing before production begins.

Unclear requests, scattered information and conflicting criteria can create rework. Compare a task that advanced with one that came back. Which condition existed in the first? Which information arrived late in the second?

An initial meeting can help if it resolves a real uncertainty. Adding a meeting to every task also takes time and can create another wait. Assess the intervention by the specific problem it should prevent.

Pay attention to work in progress

Starting something new while another task waits for a response can seem efficient. With many tasks open, the team also has to track outstanding items, recover context and rearrange priorities.

A limit on work in progress may be worth testing. Reducing new arrivals can focus effort on finishing existing work and make obstacles more visible.

The limit must account for urgency and the nature of the work. If a task awaits a slow external response, advancing another may be reasonable. Recognize the choice and track how many parallel tasks the team can sustain.

Measure something that represents delivery

Counting materials produced by the creative team helps observe that stage. To assess the whole process, track what was published and how long it took, alongside the required quality.

A single measure can redirect effort. Rewarding only volume may produce more items that need reworking. Rewarding only speed may encourage incomplete delivery.

Choose observations that help explain flow: the age of open tasks, reasons for returns and time from request to completion, for example. They answer different questions and need interpretation in context.

The Kanban Guide defines flow metrics, including work in progress and elapsed time from start to finish.

Test a small change

The fictional agency could reserve regular review time or establish criteria that allow some materials to be approved without one person's involvement. The investigation determines which option to test.

Agree on a period and monitor the effects. Did the queue shrink? Did more drafts come back? Did the problem move to another stage? A local improvement may create a cost elsewhere.

Compare the effects of interventions

Proposed changeWhen it may helpWhat to check across the complete process
Reserve review time.Ready items wait because the reviewer is unavailable.Time to publication and number of returns.
Confirm the offer condition before production.Missing information causes repeated returns.Whether confirmation prevents rework or merely creates another wait.
Increase creative capacity.Production limits output and review can absorb the volume.Completed publications, quality and growth of subsequent queues.

Start by testing a hypothesis supported by the records and follow comparable deliverables. A period with simpler work may look like an improvement even if the process has not changed.

Use the problem investigation worksheet to record a real path. Choose a delayed deliverable, reconstruct its waits and compare it with one that advanced. That comparison gives you a more concrete basis for changing the process than asking everyone to work faster.

References

  1. Kanban Guides, definitions of work in progress and flow metrics

Comments

What experience or different perspective would you add to this conversation?

Comments are reviewed before publication. Disagreement is welcome; be respectful and avoid confidential information or other people’s personal data.

Loading comments…

Add your perspective